 |
If every PARKER does a little, a lot will get done.
|
|
 |
PATIO LOCATION
This is a map of the area where our patio will be built. This area is being refurbished by the City of Pinellas Park and will be an improvement to the area for everyone's enjoyment. The exact location for the patio has not been determined at this time. The building at the bottom right corner is the new Train Station and the building in the top right corner is the Auditorium. We are hopeful that the patio will be placed in plain view of the Auditorium, so that everyone can enjoy both at the same time.
Our preliminary plan is to have a patio approximately 15 ft. x 15ft. which will need approximately 600 bricks to accomplish. All engraved bricks will be placed towards the center with additional plain bricks completing the square. We would like to add two benches and a center piece of some sort with a dedication plaque. All preparation and installation will be contracted out and will also be at our expense, hopefully the price we are asking for each engraved brick will cover the entire cost of our patio.
Thank you for your support!
|
|
All material Copyrighted by the "Pinellas Park Dance Reunion".
|
|
|
|
 |